THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27.
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.
As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA.

During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek.
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration., This news data comes from:http://redcanaco.com
Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion.
- Marcos, first lady visit Cambodia to boost ties
- Harold Cabreros takes post as new OCD chief
- Comelec to open nearly two-year overseas voter registration for 2028 elections
- Thai PM Paetongtarn Shinawatra sacked; new turmoil feared
- VP Sara lauds Filipino heroes
- President Marcos to attend 80th UN General Assembly in New York
- Trump tells Europe to put economic pressure on China over Ukraine
- DoTr seeks higher budget for 2026, requests P531B amid cuts
- Govt monitoring Chinese ‘sleeper agents’ in PH
- Preliminary report on Lisbon funicular accident expected